Core network failure caused power outages on Otaniemi campus
Power was cut from multiple buildings on campus but returned by 15.25
Power was out at shopping centre A Bloc (Otaniementie 12), Väre building (Otaniementie 14), School of Business building (Ekonominaukio 1), Metallimiehenkuja 2 and Metallimiehenkuja 4 but returned at around 15.00. The power returned to Undergraduate Centre (Otakaari 1) at around 15.25.
The problem was in the core network. The power failure began at 14.03.
Read more news
Postponed: Maintenance break in Aalto Version Control System on 30 June from 09:00 onwards
Estimated duration of the break is one hour
Join the Aalto Startup Center community of startups!
Applications are open for our main accelerator, the Business Generator program. Deadline coming up on August 7th.
PulseOn Oy sprung up from the Nokia Bridge Program
In 2011, Nokia Oyj launched its extensive Nokia Bridge Program that aimed to help experts start entrepreneurship and find employment after being laid off. Aalto Startup Center offered business accelerator services to the participants and coached them in innovation and commercial processes.