ºÚÁÏÍø

News

Power outage in Otaniemi area

There was a power outage in Otaniemi area. The issue is now resolved and repaired.
Otaniemi kampus ilmakuva
Image: Mikko Raskinen / Aalto University

The issue was repaired by 10 am. There was a failure in the core network, that began at 8.50 am.

A power outage in Otaniemi area affected the following buildings: Open Innovation House (Maarintie 6), Maarintie 8, CS Building (Konemiehentie 2), Otakaari 4 (K building 1), Puumiehenkuja 3 (K building 2), Puumiehenkuja 5 (K building 3) and Sähkömiehentie 4 (K building 4).

  • Updated:
  • Published:
Share
URL copied!

Read more news

A conference hall filled with attendees sitting at tables, watching a presentation on a large screen.
Campus, Research & Art Published:

Physics Days 2026 gathered Finnish physicists ºÚÁÏÍø

The 2026 edition of the annual conference featured talks on moiré matter, women in physics and paper cuts.
Speaker and attendees at Demo Day 2025 event
Campus Published:

A Grid in 2025: Record demand, new faces, and a calendar that brought the ecosystem together

More teams, more traction, and more touchpoints: A Grid’s 2025 affirmed Otaniemi’s place as a launchpad for ambitious founders.
Graphic illustration of distruptions in internet signal, electricity, water and other maintenance items
Campus Published:

Interruption in heat supply 4th March

Interruption in heat supply impacting following buildings: Kemistintie 1, Vuorimiehentie 1, Vuorimiehentie 2 (Bionova), Metallimiehenkuja 2, Metallimiehenkuja 4 ja Otaniementie 9 (Harald Herlin Learning Centre).
Aalto Startup Center x A Grid Demo Day 2026
Campus, Cooperation Published:

Join us for Demo Day 2026 - March 4 at A Grid

On March 4th, A Grid is the place to be because Aalto Startup Center x A Grid Demo Day will be taking place.